Quoting software for metals service centers

Grade, size, length, cut.
Then the price moves.

Metals quoting software reads an RFQ or cut list and drafts the quote for your rep to price and check. ChannelFlex reads grade, dimension, wall, length and piece count from every line, matches each one to your inventory, flags what you are short or do not carry, and hands your rep a draft to price against today's replacement cost.

Your reps approve every quote before it goes out.
Steel bars, angles, and tubing racked in a metals service center
29 lines matched, high confidence
3 lines flagged for your rep
Representative example

Quoting today

The specs are dense. The price moved. The customer is waiting.

A metals quote is a careful read of grade and dimension, a cut list, a stock check that often comes back short, and a pricing call against a cost that moved this week. Every step is manual, and every step is a place to be slow.

Grade and dimension in every notation

"2 x 2 x 1/4 A36 angle" or "L2x2x1/4, A36, 20 ft." Same item, two ways to write it, and a dozen more in the next email. Your rep normalizes each line before they can check stock.

Twenty lengths wanted, ten on the rack

The customer wants 20 lengths. You have 10. The quote now waits on a sister branch, a vendor or the mill to answer. If the line is cut-to-length, the yield, the cut charge and the remnant still have to be worked out before anyone prices it.

Replacement cost moved since the RFQ came in

Mill price, surcharge and tariff all moved this week. The cost in your ERP is last month's. Quote off it and you win the job underwater, or pad it and lose to whoever read the market this morning.

How ChannelFlex handles it

How ChannelFlex handles a metals RFQ

Read the specs, match the inventory, and put the cut and pricing decisions in front of your rep fast. A person approves every quote.

01

Capture the request

Forward the RFQ, cut list, spreadsheet, or text from the shop floor. ChannelFlex reads grade, dimension, length, quantity and piece count from every line.

Inbound · Ridgeline Fab & Weld7:48 AM
XLSX · cut_list_oct.xlsx

“L2x2x1/4 A36 20 ft x40; 2" SCH 40 A53 ERW, 30 pcs @ 47-1/2"; 4140 HR rd 3-1/2 x 12 ft, 2 pcs, certs required”

02

Triage stock vs non-stock

Each line is matched to your inventory with a confidence score. Odd grades, short stock and cut lines are flagged for the rep.

Structured · 32 linesReady to review
L2x2x1/4 A36 20 ftANG-2-2-025-A36
2" SCH 40 A53 ERWPIP-2-40-A53
rep changed from PIP-2-40-A106
30 pcs @ 47-1/2" cutreview
03

Source the non-stock

Non-stock grades and short lengths are routed to your vendor options and kept together, so the rep starts from a short list.

Non-stock · 2 itemsSourcing
4140 HR round 3-1/2"2 vendor options
L2x2x1/4 A36, 10 lengths shortBranch + vendor
04

Rep checkpoint

Your rep confirms the match, sets yield, cut charge and certs, and prices against today's replacement cost. A person approves every quote.

AP
Alex P. · Inside sales
Reviewing 32 lines
29 approved · 3 flaggedReview 3 flagged
05

Quote goes out

A clean quote with every line tied to an inventory item, out while the price you quoted is still the price.

Quote #Q-8812Ready
32 linesSent 10:30 AM
Total$27,980.00
06

Hand off to the ERP

On acceptance the quote becomes a sales order in your ERP, cut instructions and cert requirements carried as line notes, with no retyping.

Sales order SO-7720
32 lines · no rekeyingPushed to ERP

Representative example. Companies, people, part numbers, and prices shown are fictional.

Works alongside the ERP you already run

SAPEpicorProphet 21NetSuiteMicrosoft Dynamics 365Business Central

Running Jonas, Invera or Pentagon? Mention it on the demo call.

Results

What Metals, Pipe & Tube distributors see once ChannelFlex is on the desk.

15 sec
To turn an RFQ into quote-ready line items, down from 60 minutes
3+ hrs
Manual entry saved per rep, every day
90%+
Line-item match accuracy, with review on the rest
$150K
Recovered per year from quotes that used to slip away

References available on the demo call.

What it takes to start

Live in weeks, not months

Real requests flowing within two to four weeks of starting. Reps forward requests the way they do today and approve the draft in ChannelFlex; the one new screen is the review checkpoint.

A pilot first, with fair and transparent pricing

Start with a pilot on your own requests and prove it on your desk before you commit. Straightforward terms, explained before you start.

Questions

What Metals teams ask before they book.

It reads the piece count and cut length off the line, matches the stock size and grade, and flags the line for your rep. The rep sets the yield, the cut charge and any cert requirement before pricing. ChannelFlex does not set cut charges on its own today.

Nick TomassettiFrom our founderKey-Person Risk in Distribution Quoting: What Happens When Your Best Rep LeavesWhat happens when pricing lives in one person's head.

See ChannelFlex turn an RFQ into a quote, live.

A 30-minute demo built around representative Metals, Pipe & Tube requests. Have a real one? Send it before the call and we will run it live instead.